Mullet Hall – Recycled Glass Concrete Aggregate (Poraver)

Posted by on May 7, 2018
Mullet Hall – Recycled Glass Concrete Aggregate (Poraver)

One of the most exciting aspects of the Mullet Hall project is one that will never be seen once it is covered with insulation and finished. About 6/7 of the […]

Mullet Hall – Thermal Bridges

Posted by on Apr 19, 2018
Mullet Hall – Thermal Bridges

Paying close attention to thermal bridging in the details is something that is extremely important – as important as insulation. Here is a Greenbuildingadvisor.com post describing what thermal bridging is […]

Mullet Hall – Living Building Challenge – Site Petal

Posted by on Apr 17, 2018
Mullet Hall – Living Building Challenge – Site Petal

Why does the Mullet Hall Project Team feel that it is appropriate to build on this greenfield site? Human Powered Living The Site is within 2km of a major train […]

Mullet Hall – Trees Cleared for Milling

Posted by on Apr 13, 2018
Mullet Hall – Trees Cleared for Milling

As part of the subdivision process, every single tree on the entire Mullet Hall property above 12″ caliper was tagged. This allowed for easily identification of trees for removal, saving, […]

Pretty Good Home Site

Posted by on Aug 23, 2017
Pretty Good Home Site

So here it is. Here is where we intend to build a home. As David wrote somewhere on Green Building Advisor (or at Wolfe Island Passive House), the goal here […]

Land Development and Trees

Posted by on Aug 22, 2017
Land Development and Trees

As a self-proclaimed treehugger, it is certainly with some trepidation that I reach my arms around trees in order to tag them for removal. But what I have learned from […]

Perfect Solutions and the Pretty Good House

Posted by on Mar 31, 2017
Perfect Solutions and the Pretty Good House

Like most architects, I am susceptible to believing two things: That a perfect solution to a design problem has yet to be discovered, and If I think enough about said […]

Wall Sketches

Posted by on Mar 23, 2017
Wall Sketches

Another day of intense wall research and discussion, and we are back to the 2×6 Advanced Frame Wall Construction with Mineral Fiber Insulation (AFWCMFI Wall), with a total R of […]

CLT and Double Stud and PERSIST, oh my!

Posted by on Mar 14, 2017

Those who have been around me any time during the last few months will know that one of the main topics on my mind has been the appropriate wall system […]

Design in 3d

Posted by on Mar 2, 2017

One of the benefits of working in 3d is that a design that is merely in formation in plan can be examined from all angles – literally. This is mostly […]